Preparation of concrete mix |
There are
two types of concrete mixing
(i)Hand mixing
(ii)Machine
mixing
Hand Mixing: This method of mixing concrete
is resorted to when the quantity if concrete to be used in a work is
insufficient to warrant the necessity of machine. This is used with advantage
in places where machinery cannot be used on account of their non-availability
or in works near a hospital where the noise of machine is not desirable. Hand
mixing is done on a clean, hard and impermeable surface. Cement and sand are
first mixed dry with the help of shovels until the mixture attains uniform
color. Aggregative are then added to this mixture and the whole mixture is then
turned by shovels until the stone pieces uniformly spread throughout. After
this, desired are quantity of water is poured into the heap from a can fitted
with a rose. The mass is then turned until a workable mixture is obtained. It
is advised to add 10% extra cement to guard against the possibility of
inadequate mixing by this method.
Machine
Mixing: The machine
used for mixing concrete is termed as concrete mixer. Two types of concrete
mixers are in common are
1.
Continuous mixers
2.Batch
mixers
Continuous
mixers are employed in massive construction where large and continuous flow of
concrete is desired. The process of feeding the mixing is more or less
automatic. The machine requires careful supervision so as to obtain the
concrete mix of desired consistency.
In batch
type of concrete mixer. The desired proportion of materials are fed into the
hopper of a drum in which the materials get mixed by the series of blades or
baffles inside the mixer. Batch mixers are further two types 1. Tilting drum
type 2. closed drump type. In the first type, components are fed in the
revolving drum in a tilted position and after sometime the concrete mix is
discharged by tilting the drums in the opposite direction. In the latter type
the drum remains rotating in one direction and emptied by means of hopper which
tilts to receive the discharge.
While using
the mixer, coarse aggregates should be fed first, sand and cement should be put
afterwards. In this revolving state, the components get mixed while water is
poured with the help of can. The concrete should be for atleast 2 minutes, the
time being measured after all the ingredients including water have been fed
into the drum.